The keywords characterising the Japandi interior finish package are brightness, lightness and nature. The oak parquet and ivory walls create a sense of freshness and openness in the rooms.
Living room
Living room floor: 1-slip, oak, oil wax 3477 Grafiit
Entrance hall floor: Fioranese Sfrido Cemento 1 Bianco, 600 × 600 mm
Interior doors: white painted interior door with one panel
Luminaire: LED, black finish
Wall colour: Tikkurila G485 (Canvas), semi-matte
Sockets and switches: Schneider Merten D Life, lotus white
Door handles: Fikostar Stockholm UL 1140, aluminium, matte black
Skirting boards: painted white, 16 × 60 mm square board
Bathroom
The light tonality of Japandi bathrooms creates space. Tiles with various patterns and black bathroom fixtures are welcome accents.
Bathroom accent tile: Fioranese Kintsugi Japan Hibi Moonlight, 600 × 600 mm
Wall-mounted toilet: Teka wall-mounted toilet MANACOR Rimless Nano glazing STROHM, soft close lid
Flush button: mechanical SLIM OLI, soft touch, black finish
Washbasin: CONNECT AIR Ideal Standard, white finish (different measurements according to layout)
Shower and bath mixer: GRB “TIME MALE” XL hand and head shower with a fixed pole, black finish, with thermostat
Vanity: CONNECT AIR, one drawer, high-gloss white structure and matte white (different measurements according to layout)
Washbasin mixer: GRB “TIME MALE” XL, matte black finish (different heights according to washbasin)
Mirror: Dubiel Vitrum, front lighting, aluminium frame, matte black finish (different measurements)
Luminaire: LED, black finish
Bathtub: HOTLINE Ideal standard, front panel and end panel, if necessary (different measurements according to layout)
Shower glass: height depends on ceiling height
Merko’s professionalism and years of experience will ensure the construction quality of the development.
Estonia’s most respected real estate developer
Emor 2019, 2020, 2021, 2022 & 2023
Building attributes
Energy class
The energy efficiency rating calculated for the residential and commercial buildings being constructed at 26//28 Sõpruse Avenue is equivalent to energy class A. Solar panels will be installed on the roofs of the buildings.
Building structures
The load-bearing structures on the underground level of the apartment building will be monolithic reinforced concrete posts, beams and walls with suspended ceilings made from hollow reinforced concrete panels. The load-bearing framework of the above-ground floors will be formed from prefabricated single- and triple-layer reinforced concrete elements. To ensure greater sound insulation, the suspended ceilings are to be made from 265 mm hollow reinforced concrete panels.
Internal walls, stairwells & corridors
To ensure greater sound insulation, the walls between apartments will be made from 200 mm reinforced concrete panels. The partition walls within apartments will be plasterboard walls on a metal framework. The walls of wet rooms are to be made from lightweight blocks. The above-ground sections of both buildings feature a stairwell with two lifts.
Apartment attributes
Balconies, loggias & terraces
The balconies and 5th-floor terraces will feature glass railings. The balconies overlooking the Sõpruse Avenue have been designed as loggias, with the lower glass railings fitted with sliding glass enabling the balconies to be closed in. The metal railings on the 1st-floor terraces and private courtyard areas are to be fitted with gates providing access to the shared courtyard.
Doors & windows
The windows in the apartments will be triple-glazed with timber and aluminium frames. The external doors of the apartments will be fireproof veneer wooden doors. Depending on the height of the ceilings, the internal doors will be either 210 cm or 230 cm high. Two options are available: painted panel doors or wooden doors with a veneer finish.
Ceiling height
The apartments on the 1st floor will have higher ceilings, reaching to 3,1 metres. The ceilings in the apartments on the 2nd, 3rd and 4th floors will measure 2,75 metres. Higher ceilings will feature again in the apartments on the 5th floor, standing at 3,0 metres.
Heating & ventilation
Heating & interior climate
The buildings will be connected to the central heating system operated by Utilitas Tallinn. Water-based floor heating which can be adjusted in every room will ensure an energy-efficient interior climate. The heating pipe cabinet in each apartment will be installed in the hallway closet or utility room. Effective air exchange and healthy air within the apartments will be ensured with an apartment-based forced ventilation system with a rotary heat-exchanger. Ventilation equipment will be situated in the utility room, wardrobe or bathroom. Apartment-based exhaust channels will be installed for kitchen rangehoods. Air conditioning is available for the living room and one bedroom in each apartment, which buyers can purchase for an additional fee.
Smart buildings
All of the apartments are to be constructed according to the principle of ‘smart buildings’, which means that access, the internal climate and the reading of meters will be automated. The standard ‘smart building’ installation for apartments includes heating and ventilation controls, an intercom system with picture and sound and the reading of electricity and hot and cold water meters. Readings will be automatically forwarded to the building manager. All of the foregoing will be able to be managed and monitored online or via the monitor in the apartment.
Water & electricity
Water supply & sewerage
The buildings will be connected to Tallinn’s water supply and sewerage system. Hot water will be produced on site in the complex’s own boiler plant. Water meters will be read remotely. Readings will be taken automatically and forwarded to the building manager’s database. Commercial spaces will obtain hot water from the boiler on their own premises.
Electricity & weak-current systems
Remotely read electricity meters will be located in the switchboard in the car park. The apartment distribution board with electricity and weak-current parts will be flush to the wall in the hallway closet or in the utility room. Switches, power points and recessed ceiling lighting will be installed in the apartments in locations selected by the interior architect. Balconies, loggias and terraces will be fitted with lighting and a power point suitable for use in outdoor conditions. Technical preparations will be in place for telephone, Internet and TV service contracts to be entered into with service providers. All storage spaces will come with a metered power point for the charging of electric bikes, e-scooters and the like.
Charging of electric cars
Technical preparations will be made for charging points for electric cars to be installed in parking spaces. This means providing the cabling needed for the installation of the central smart device and chargers. The central device will be fitted with a dynamic load meter, measuring use for the entire building and directing unused and available capacity to the chargers. If residents decide to buy an environmentally friendly electric car or already have one when they move in, the charging system set up in the building will enable them to contact the service provider selected by the apartment association to provide the final connections.
Other features
Underground level
The underground car park serving both buildings will feature a large area for bikes and prams. The space for bikes will have wall-mounted bike holders, and there will also be a place for washing the bikes. A storage space has been planned for every apartment which also has a power point for the charging of electric bikes and e-scooters. The walls of the underground floor are decorated with graphics.
Courtyard area
The placement of the complex on the property will act as a sound barrier to the fenced landscaped courtyard. Play areas have been devised for the courtyard for both toddlers and young children, including a sealed bike circuit, as well as a modest relaxation area with picnic tables and seating. The relief of the surrounding green area and playground is undulating, and the landscaping is lush and versatile.
Accessibility
Between the two sets of stairs in front of both buildings there will be a ramp to ensure ease of access for wheelchair users and people with prams.
Commercial spaces
The part of the complex on the 1st floor fronting onto the street will feature three commercial spaces, access to which will be directly from the street i.e. with no need to enter the stairwells. There are separate parking spaces for visitors of the small businesses.
Get in touch,
we will gladly give you further information about the new buildings and answer any questions.
Please note that all 3D-visuals on this website are illustrative and may differ from actual results.