Renovation of the Port of Sviby, phase 2Vormsi, Läänemaa

In the second phase of the renovation of the port, a new port building and slipway, carpark and pedestrian and cycling path were built and repaved. The total area of the port roads and carparks is 6,000 m². The area of the port building, which is heated by geothermal heat extracted from sea water, is 149 m². The ground floor has a waiting room for passengers, WC facilities and a port administrator’s office, and there is a sauna and shower room upstairs.

Besides the main port building, the contract also covered a sand and oil filter, a waste water treatment unit with a capacity of 2.1 m³/d and a 60 m deep bore well and pump station. An outbuilding was also built to house the water treatment system using an iron filter and reverse osmosis, with a capacity of 1.5 m³/d. A total of 385 m of water pipe was installed for the project.

Client:
AS Saarte Liinid
Name of the project:
Renovation of the Port of Sviby, phase 2
Category:
Civil engineering
Type of construction:
Port facilities
Description of work:
New building
Country:
Estonia
Address:
Vormsi, Läänemaa
Beginning of project:
2016
Completion year:
2017
Characteristic feature:
Port building 149 m2; roads and plots 6,000 m2

Welcome to our new website!

You are currently on the website of
AS Merko Ehitus Eesti, Estonian leading construction company.
www.merko.ee.

The website of AS Merko Ehitus group listed on Nasdaq OMX Tallinn, is from now on
group.merko.ee.

Welcome to our new website!

You are currently on the website of
AS Merko Ehitus Eesti, Estonian leading construction company.
www.merko.ee.

The website of AS Merko Ehitus group listed on Nasdaq OMX Tallinn, is from now on
group.merko.ee.